• Contact

INFINITE WATERPROOFING SOLUTIONS

Main menu

Skip to content
  • Under Construction
Show Grid Show List

AGA 2013 Construction Outlook for Minnesota

February 1, 2013 by Josh Swisher

2013 Minnesota Construction Outlook 2013 is upon us an as the year progresses, many firms are wondering what is in store for this fiscal year. Above is a link to the Associated General Contractors of America site with survey answers from firms like your own.  

Categories: Architectual, Business, Design, Education, Engineering, Job Progress, Uncategorized • Tags: Building, Construction, Growth, Minneapolis, Minnesota, New Construction, Outlook, Rennovation, St.Paul

0

TPO Investigation and Repair

January 16, 2013 by Josh Swisher

With this investigation, we encountered a seam of the existing TPO membrane that had broken and was allowing water to leak into the structure.  We cleaned and prepped the area with approved methods and proceeded to patch the seam by welding a piece of TPO over the damaged area and thus fixing and preventing the [...]

Categories: Education, Investigation, TPO • Tags: Education, Investigation, Monolithic, Proper Technique, Repair, TPO

2

The Beginning

January 11, 2013 by Lee Wickstrom

In 2006, Spec 7 Group started installing waterproofing systems. We would like to thank Brit’s Pub for allowing us the opportunity to prove ourselves as a professional contractor. If visiting downtown Minneapolis go enjoy some fish and chips at Brit’s Pub.  

Categories: Business, Hot-Rubber • Tags: American Hydrotech, Brit's Pub, Hot-Rubber

0

Injection

January 10, 2013 by Lee Wickstrom

Categories: Blindside Repair, Injection, Target Injection

0

Hot-Rubber (Hot-Fluid Applied)

January 8, 2013 by Lee Wickstrom

Categories: Hot-Rubber

0

Bentonite Thermoplastic Composite Systems

January 8, 2013 by Lee Wickstrom

Categories: Bentonite Thermoplastics • Tags: Benotnite, New Construction, Retro Work, Thermoplastic, TPO

0

Bentonite Applications

January 8, 2013 by Lee Wickstrom

Categories: Bentonite • Tags: New Construction, Paraseal, Retro Work, Tegraseal's Tegratite

2

Air Barrier Applications

January 8, 2013 by Lee Wickstrom

Air Barrier Applications completed throughout the last few years.

Categories: Air Barrier

0

Past to Present

January 7, 2013 by admin

With our site under construction, feel check out some photos from previous projects.

Categories: Uncategorized

0

Post navigation

Search

Categories

  • Air Barrier
  • Architectual
  • Bentonite
    • Bentonite Thermoplastics
  • Blindside Repair
  • Business
  • Design
  • Education
  • Engineering
  • Hot-Rubber
  • Injection
    • Target Injection
  • Investigation
  • Job Progress
  • TPO
  • Uncategorized

Archives

  • February 2013
  • January 2013

W.P. Cloud

Air Barrier Architectual Bentonite Bentonite Thermoplastics Blindside Repair Business Design Education Engineering Hot-Rubber Injection Investigation Job Progress Target Injection TPO Uncategorized

Meta

  • Log in
  • Entries RSS
  • Comments RSS
  • WordPress.org
Powered by WordPress | Theme: Gridspace by Graph Paper Press.